AKS Trading Logo
Sitemap
Banner
Banner Bottom
ALL KIND OF ROOF WATERPROOFING
 

A SISTER CONCERN COMPANY
 
we deal in chemical treatment of buildings problems, i.e.
 
01                Water proofing all types of roofs
02                Seepage control
03                Any type of leakage control
04                Over head/underground and water tank
05                Basement solutions
06                walls and floor treatment
 
It is first and ever real rubberized water proofing technology in Pakistan that is not only less cost then traditional bitumen method but also having more quality and life. We hope you will invite us to visit your buildings if you have any said problems, be sure and confident that we have proper solution of every such problem. We have already have number of well reputed clients in Pakistan.
 

 

List of our valued clients:
 
          Names                                             Addresses
     PC (Pearl Continental) Hotel          East Canal Road, Faisalabad
     Dawood Export Pvt Ltd                     Sarghoda Road, Faisalabad
     Regent Mall                                        D-Ground, Faisalabad
     Mubarik package                              Sarghoda Road, Faisalabad
     Rehman Heights                              Sitana Road, Faisalabad
     Muslim Associates                           Sitana Road, Faisalabad
     M.K.B Mills                                          Jaranwala Road, Faisalabad
     Noor Fatima Fabrics                        Jaranwala Road, Faisalabad
     Sadaqat Textile (Private) Ltd.          Sarghoda Road, Faisalabad
     University of Faisalabad                  Sarghoda Road, Faisalabad
     Jinnah Arcade                                    Jinnah Colony, Faisalabad
     KSM Homes                                       Canal Road, Faisalabad.
     Hockey Stadium (Private)                 Hockey Stadium, Faisalabad.
     J.B Rice Mills                                      Chiniot City.
     Rafiq Fabrics                                      Jaranwala Road Faisalabad.
     
Chemical details and Work Procedure  (Material and Chemicals) 
(01)           A.c Cleaner
(02)           Para-Mol
(03)           Para-Plus
(04)           Fast Action
(05)           Pc Cotton or Cvc
(06)           Cement
 
A.c Cleaner / Basic Coat      
First of all A.c Cleaner coating will be done. It has three purposes
I          It opens the pores of concrete
II         After its Application, even the small heir cracks which are normally can not be seen by naked eyes become visible
III        It makes the surface transparent, so that the application of next chemical become easy
Plaster Epoxy Coating (Para-Mol + Cement)
                                                            (Primer Coat)
After A.c Cleaner, Plaster Epoxy coating will be done on whole shell. It is very much plastic in nature. It penetrates into the pores open by the A.c Cleaner and closes them permanently
 
Cracks Treatment
I          S.c will be filled inside the cracks
II         Pc Cotton will be taken and will be cut according to the size of cracks (one inch more on the both sides)
III        It will be made wet in Plaster Epoxy and then be pasted over the cracks,  Valley Treatment
           A similar treatment as for cracks, will be done in valleys but with double pc system at this time
 
Rubber Epoxy Coating
Now two successive coats of Para-Plus (rubber epoxy) namely sticking and flood respectively will be done on whole shell
Fast Action (5m) Liquid Fiber
Finally this chemical will be coated on all Pc points cited above
 
Warranty                             04-08 Year
Mode of Payment              By Cash. Or Cheque 
Term of Payment              50% Advance Remaining with the progress of the work
Box Top
SoftBiz
NIKO Valves
Box Bottom